ZENTRALE QUALITAETSKONTROLLE DER LACKDRAHTFERTIGUNG WAEHREND DES FERTIGUNGSPROZESSES.

Translated title of the contribution: Central Quality Control During Production of Lacquered Wire.

Research output: Chapter in Book/Report/Conference proceedingChapter

Abstract

Equipment designed at the University of Budapest for central quality control during continuous production of lacquer-insulated wire is described. It was installed and in continuous service at the Hungarian Cable Works, working three shifts, from Jan 1969 to 1973, when service was interrupted for necessary repairs.

Original languageGerman
Title of host publicationDraht
Pages437-440
Number of pages4
Volume25
Edition8
Publication statusPublished - Aug 1974

Fingerprint

Insulated wire
Lacquers
Quality control
Cables
Repair
Wire

ASJC Scopus subject areas

  • Engineering(all)

Cite this

ZENTRALE QUALITAETSKONTROLLE DER LACKDRAHTFERTIGUNG WAEHREND DES FERTIGUNGSPROZESSES. / Benyó, Z.

Draht. Vol. 25 8. ed. 1974. p. 437-440.

Research output: Chapter in Book/Report/Conference proceedingChapter

@inbook{854f07013cc7492ab4c74bfa7224d9b4,
title = "ZENTRALE QUALITAETSKONTROLLE DER LACKDRAHTFERTIGUNG WAEHREND DES FERTIGUNGSPROZESSES.",
abstract = "Equipment designed at the University of Budapest for central quality control during continuous production of lacquer-insulated wire is described. It was installed and in continuous service at the Hungarian Cable Works, working three shifts, from Jan 1969 to 1973, when service was interrupted for necessary repairs.",
author = "Z. Beny{\'o}",
year = "1974",
month = "8",
language = "German",
volume = "25",
pages = "437--440",
booktitle = "Draht",
edition = "8",

}

TY - CHAP

T1 - ZENTRALE QUALITAETSKONTROLLE DER LACKDRAHTFERTIGUNG WAEHREND DES FERTIGUNGSPROZESSES.

AU - Benyó, Z.

PY - 1974/8

Y1 - 1974/8

N2 - Equipment designed at the University of Budapest for central quality control during continuous production of lacquer-insulated wire is described. It was installed and in continuous service at the Hungarian Cable Works, working three shifts, from Jan 1969 to 1973, when service was interrupted for necessary repairs.

AB - Equipment designed at the University of Budapest for central quality control during continuous production of lacquer-insulated wire is described. It was installed and in continuous service at the Hungarian Cable Works, working three shifts, from Jan 1969 to 1973, when service was interrupted for necessary repairs.

UR - http://www.scopus.com/inward/record.url?scp=0016092152&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0016092152&partnerID=8YFLogxK

M3 - Chapter

VL - 25

SP - 437

EP - 440

BT - Draht

ER -