Analysis of a multi-echelon production- inventory system with random supply

Attila Chikán, G. Vastag

Research output: Contribution to journalArticle

3 Citations (Scopus)

Abstract

In an earlier paper a multi-echelon production-inventory system has been described and a heuristic suggestion has been developed. The purpose of this paper is to give further analysis of the same system; namely, its dynamic behavior is discussed.

Original languageEnglish
Pages (from-to)275-281
Number of pages7
JournalEngineering Costs and Production Economics
Volume12
Issue number1-4
DOIs
Publication statusPublished - 1987

Fingerprint

Heuristics
Production-inventory system
Multi-echelon

ASJC Scopus subject areas

  • Engineering(all)

Cite this

Analysis of a multi-echelon production- inventory system with random supply. / Chikán, Attila; Vastag, G.

In: Engineering Costs and Production Economics, Vol. 12, No. 1-4, 1987, p. 275-281.

Research output: Contribution to journalArticle

@article{a8a4322aefd543b5ac9098fa36b02d53,
title = "Analysis of a multi-echelon production- inventory system with random supply",
abstract = "In an earlier paper a multi-echelon production-inventory system has been described and a heuristic suggestion has been developed. The purpose of this paper is to give further analysis of the same system; namely, its dynamic behavior is discussed.",
author = "Attila Chik{\'a}n and G. Vastag",
year = "1987",
doi = "10.1016/0167-188X(87)90088-7",
language = "English",
volume = "12",
pages = "275--281",
journal = "International Journal of Production Economics",
issn = "0925-5273",
publisher = "Elsevier",
number = "1-4",

}

TY - JOUR

T1 - Analysis of a multi-echelon production- inventory system with random supply

AU - Chikán, Attila

AU - Vastag, G.

PY - 1987

Y1 - 1987

N2 - In an earlier paper a multi-echelon production-inventory system has been described and a heuristic suggestion has been developed. The purpose of this paper is to give further analysis of the same system; namely, its dynamic behavior is discussed.

AB - In an earlier paper a multi-echelon production-inventory system has been described and a heuristic suggestion has been developed. The purpose of this paper is to give further analysis of the same system; namely, its dynamic behavior is discussed.

UR - http://www.scopus.com/inward/record.url?scp=0022750266&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0022750266&partnerID=8YFLogxK

U2 - 10.1016/0167-188X(87)90088-7

DO - 10.1016/0167-188X(87)90088-7

M3 - Article

AN - SCOPUS:0022750266

VL - 12

SP - 275

EP - 281

JO - International Journal of Production Economics

JF - International Journal of Production Economics

SN - 0925-5273

IS - 1-4

ER -