• 1171 Citations
  • 14 h-Index
19972018

Research output per year

If you made any changes in Pure these will be visible here soon.

Research Output

2018

Corporate governance: The evaluation based approach to the governance and business models of the Epic centre of excellence in production informatics and Control (EPIC CoE)

Monostori, L., Kádár, B., Nick, G., Pfeiffer, A., Várgedő, T. & Hecklau, F., Jan 1 2018, Proceedings of the 14th European Conference on Management, Leadership and Governance, ECMLG 2018. de Waal, B. M. E. & Ravesteijn, P. (eds.). Academic Conferences and Publishing International Limited, p. 161-170 10 p. (Proceedings of the 14th European Conference on Management, Leadership and Governance, ECMLG 2018).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Orchestrated platform for cyber-physical systems

Lovas, R., Farkas, A., Marosi, A. C., Ács, S., Kovács, J., Szalóki, Á. & Kádár, B., Jan 1 2018, In : Complexity. 2018, 8281079.

Research output: Contribution to journalArticle

Open Access
5 Citations (Scopus)

Smart, simulation-based resource sharing in federated production networks

Kádár, B., Egri, P., Pedone, G. & Chida, T., Jan 1 2018, In : CIRP Annals. 67, 1, p. 503-506 4 p.

Research output: Contribution to journalArticle

6 Citations (Scopus)

Synergy of multi-modelling for process control

Beregi, R., Szaller, Á. & Kádár, B., Jan 1 2018, In : IFAC-PapersOnLine. 51, 11, p. 1023-1028 6 p.

Research output: Contribution to journalArticle

4 Citations (Scopus)
2017

Scheduling and Operator Control in Reconfigurable Assembly Systems

Gyulai, D., Kádár, B. & Monostori, L., Jan 1 2017, In : Procedia CIRP. 63, p. 459-464 6 p.

Research output: Contribution to journalConference article

3 Citations (Scopus)

Simulation model study for manufacturing effectiveness evaluation in crowdsourced manufacturing

Kaihara, T., Katsumura, Y., Suginishi, Y. & Kádár, B., Jan 1 2017, In : CIRP Annals - Manufacturing Technology. 66, 1, p. 445-448 4 p.

Research output: Contribution to journalArticle

7 Citations (Scopus)
2016

Cyber-physical systems in manufacturing

Monostori, L., Kádár, B., Bauernhansl, T., Kondoh, S., Kumara, S., Reinhart, G., Sauer, O., Schuh, G., Sihn, W. & Ueda, K., Jan 1 2016, In : CIRP Annals. 65, 2, p. 621-641 21 p.

Research output: Contribution to journalArticle

481 Citations (Scopus)

Manufacturing Lead Time Estimation with the Combination of Simulation and Statistical Learning Methods

Pfeiffer, A., Gyulai, D., Kádár, B. & Monostori, L., 2016, Procedia CIRP. Elsevier, Vol. 41. p. 75-80 6 p.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

13 Citations (Scopus)

Performance measurement in flow lines - Key to performance improvement

Stricker, N., Pfeiffer, A., Moser, E., Kádár, B. & Lanza, G., 2016, (Accepted/In press) In : CIRP Annals - Manufacturing Technology.

Research output: Contribution to journalArticle

9 Citations (Scopus)

Simulation support in construction uncertainty management: A production modelling approach

Pfeiffer, A., Kádár, B., Bohács, G. & Gáspár, D., 2016, In : Periodica Polytechnica Transportation Engineering. 44, 2, p. 115-122 8 p.

Research output: Contribution to journalArticle

2 Citations (Scopus)

The RobustPlaNet Project: Towards Shock-Robust Design Of Plants And Their Supply Chain Networks

Jauregui Becker, J. M., Kadar, B., Colledani, M., Stricker, N., Urgo, M., Unglert, J., Gyulai, D. & Moser, E., Jan 1 2016, In : IFAC-PapersOnLine. 49, 12, p. 29-34 6 p.

Research output: Contribution to journalArticle

2 Citations (Scopus)

Towards coordination in robust supply networks

Egri, P., Kádár, B. & Váncza, J., 2016, In : IFAC-PapersOnLine. 49, 12, p. 41-46 6 p.

Research output: Contribution to journalArticle

2 Citations (Scopus)
2015

Robust production planning and capacity control for flexible assembly lines

Gyulai, D., Kádár, B. & Monosotori, L., May 1 2015, In : IFAC-PapersOnLine. 28, 3, p. 2312-2317 6 p.

Research output: Contribution to journalConference article

Open Access
13 Citations (Scopus)

Supporting multi-level and robust production planning and execution

Stricker, N., Pfeiffer, A., Moser, E., Kádár, B., Lanza, G. & Monostori, L., Jan 1 2015, In : CIRP Annals - Manufacturing Technology. 64, 1, p. 415-418 4 p.

Research output: Contribution to journalArticle

9 Citations (Scopus)
2014

Capacity management for assembly systems with dedicated and reconfigurable resources

Gyulai, D., Kádár, B., Kovács, A. & Monostori, L., 2014, In : CIRP Annals - Manufacturing Technology. 63, 1, p. 457-460 4 p.

Research output: Contribution to journalArticle

25 Citations (Scopus)

Capacity planning and resource allocation in assembly systems consisting of dedicated and reconfigurable lines

Gyulai, D., Kádár, B. & Monostori, L., Jan 1 2014, In : Procedia CIRP. 25, C, p. 185-191 7 p.

Research output: Contribution to journalConference article

Open Access
10 Citations (Scopus)
2013

Methodology and data-structure for a uniform system's specification in simulation projects

Kardos, C., Popovics, G., Kádár, B. & Monostori, L., Jan 1 2013, In : Procedia CIRP. 7, p. 455-460 6 p.

Research output: Contribution to journalConference article

Open Access
5 Citations (Scopus)

Semantic Virtual Factory supporting interoperable modelling and evaluation of production systems

Kádár, B., Terkaj, W. & Sacco, M., May 10 2013, In : CIRP Annals - Manufacturing Technology. 62, 1, p. 443-446 4 p.

Research output: Contribution to journalArticle

49 Citations (Scopus)
2012

Applying model-reconstruction by exploring MES and PLC data for simulation support of production systems

Pfeiffer, A., Kadar, B., Popovics, G., Kardos, C., Ven, Z., Kemeny, L. & Monostori, L., Dec 1 2012, Proceedings of the 2012 Winter Simulation Conference, WSC 2012. 6465069. (Proceedings - Winter Simulation Conference).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

1 Citation (Scopus)

Automatic simulation model generation based on PLC codes and MES stored data

Popovics, G., Pfeiffer, A., Kádár, B., Vén, Z., Kemény, L. & Monostori, L., Jan 1 2012, In : Procedia CIRP. 3, 1, p. 67-72 6 p.

Research output: Contribution to journalConference article

Open Access
5 Citations (Scopus)

Automatic simulation model generation supported by data stored in low level controllers

Popovics, G., Kardos, C., Pfeiffer, A., Kádár, B., Vén, Z. & Monostori, L., Jan 1 2012, Proceedings - INCOM'12, 14th IFAC Symposium on Information Control Problems in Manufacturing. 6 PART 1 ed. IFAC Secretariat, p. 242-247 6 p. (IFAC Proceedings Volumes (IFAC-PapersOnline); vol. 45, no. 6 PART 1).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

2 Citations (Scopus)

Execution data connected simulation for production operation planning and control

Kádár, B., Pfeiffer, A. & Monostori, L., Jan 1 2012, Proceedings - INCOM'12, 14th IFAC Symposium on Information Control Problems in Manufacturing. 6 PART 1 ed. IFAC Secretariat, p. 1604-1608 5 p. (IFAC Proceedings Volumes (IFAC-PapersOnline); vol. 45, no. 6 PART 1).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Maintenance planning in re-entrant flow shop (3rd report) - Development of dispatching method & trial validation

Suginishi, Y., Lengyel, A., Kadar, B. & Nonaka, Y., Jun 2012, In : Seimitsu Kogaku Kaishi/Journal of the Japan Society for Precision Engineering. 78, 6, p. 505-510 6 p.

Research output: Contribution to journalArticle

Open Access
2011

Novel it solutions for increasing transparency in production and in supply chains

Monostori, L., Ilie-Zudor, E., Kádár, B., Karnok, D., Pfeiffer, A., Kemény, Z. & Szathmári, M., Jan 1 2011, 21st International Conference on Production Research: Innovation in Product and Production, ICPR 2011 - Conference Proceedings. Krause, T., Spath, D. & Ilg, R. (eds.). Fraunhofer-Verlag, (21st International Conference on Production Research: Innovation in Product and Production, ICPR 2011 - Conference Proceedings).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

PLC code processing for automatic simulation model generation

Popovics, G., Pfeiffer, A., Kádár, B., Vén, Z. & Monostori, L., Jan 1 2011, p. 155-159. 5 p.

Research output: Contribution to conferencePaper

2 Citations (Scopus)
2010

Digital enterprise solution for integrated production planning and control

Monostori, L., Erdos, G., Kádár, B., Kis, T., Kovács, A., Pfeiffer, A. & Váncza, J., Feb 1 2010, In : Computers in Industry. 61, 2, p. 112-126 15 p.

Research output: Contribution to journalArticle

17 Citations (Scopus)

Enhanced control of complex production structures by tight coupling of the digital and the physical worlds

Kádár, B., Lengyel, A., Monostori, L., Suginishi, Y., Pfeiffer, A. & Nonaka, Y., Apr 20 2010, In : CIRP Annals - Manufacturing Technology. 59, 1, p. 437-440 4 p.

Research output: Contribution to journalArticle

44 Citations (Scopus)

Towards adaptive and digital manufacturing

Monostor, L., Csáji, B. C., Kádár, B., Pfeiffer, A., Ilie-Zudor, E., Kemény, Z. & Szathmári, M., Apr 2010, In : Annual Reviews in Control. 34, 1, p. 118-128 11 p.

Research output: Contribution to journalArticle

28 Citations (Scopus)
2009

Introduction of simulation method and possibilities of standardisation

Perger, J., Jósvai, J., Pfeiffer, A. & Kádár, B., Jan 1 2009, p. 224-231. 8 p.

Research output: Contribution to conferencePaper

Novel IT approaches and solutions towards real-time, cooperative enterprises

Monostori, L., Váncza, J., Kis, T., Kádár, B., Erdos, G., Karnok, D. & Egri, P., Jan 1 2009, Proceedings of the 13th IFAC Symposium on Information Control Problems in Manufacturing, INCOM'09. 4 PART 1 ed. IFAC Secretariat, p. 720-727 8 p. (IFAC Proceedings Volumes (IFAC-PapersOnline); vol. 42, no. 4 PART 1).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

7 Citations (Scopus)

Self-building simulation tool for daily decision support in production control

Pfeiffer, A., Kádár, B., Szathmári, M., Popovics, G., Vén, Z. & Monostori, L., Jan 1 2009, p. 246-254. 9 p.

Research output: Contribution to conferencePaper

6 Citations (Scopus)
2008
10 Citations (Scopus)

Situation detection in production control by applying on-line simulation

Pfeiffer, A., Kádár, B., Monostori, L. & Vén, Z., 2008, 5th International Conference on Digital Enterprise Technology, DET 2008. Publibook, p. 225-241 17 p.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

1 Citation (Scopus)
2007

Simulation-based validation of production control decisions, subject to resource availability

Pfeiffer, A., Kádár, B. & Monostori, L., Dec 1 2007, International Mediterranean Modeling Multiconference, I3M 2007. (International Mediterranean Modeling Multiconference, I3M 2007).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Solution Approaches to Real-time Control of Customized Mass Production

Monostori, L., Kádár, B., Pfeiffer, A. & Karnok, D., Jun 15 2007, In : CIRP Annals - Manufacturing Technology. 56, 1, p. 431-434 4 p.

Research output: Contribution to journalArticle

38 Citations (Scopus)

Stability-oriented evaluation of rescheduling strategies, by using simulation

Pfeiffer, A., Kádár, B. & Monostori, L., Sep 1 2007, In : Computers in Industry. 58, 7, p. 630-643 14 p.

Research output: Contribution to journalArticle

50 Citations (Scopus)
2006

Integration of production-, quality- and process monitoring for agile manufacturing

Viharos, Z. J., Kádár, B., Monostori, L., Kemény, Z., Csáji, B., Pfeiffer, A. & Karnok, D., Dec 1 2006, 18th IMEKO World Congress 2006: Metrology for a Sustainable Development. p. 125-130 6 p. (18th IMEKO World Congress 2006: Metrology for a Sustainable Development; vol. 1).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

1 Citation (Scopus)

Real-time, cooperative enterprises: Requirements and solution approaches

Monostori, L., Váncza, J., Kis, T., Kádár, B. & Viharos, Z. J., Dec 1 2006, 12th IFAC Symposium on Information Control Problems in Manufacturing, INCOM 2006, and Associated Industrial Meetings: EMM'2006, BPM'2006, JT'2006. PART 1 ed. (IFAC Proceedings Volumes (IFAC-PapersOnline); vol. 12, no. PART 1).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

2 Citations (Scopus)

Real-Time, Cooperative Enterprises: Requirements and Solution Approaches

Monostori, L., Váncza, J., Kis, T., Kádár, B. & Viharos, Z. J., Dec 1 2006, Information Control Problems in Manufacturing 2006. Elsevier Ltd, p. 561-566 6 p.

Research output: Chapter in Book/Report/Conference proceedingChapter

7 Citations (Scopus)

Reinforcement learning in a distributed market-based production control system

Csáji, B. C., Monostori, L. & Kádár, B., Jul 1 2006, In : Advanced Engineering Informatics. 20, 3, p. 279-288 10 p.

Research output: Contribution to journalArticle

24 Citations (Scopus)
2005

Building agent-based systems in a discrete-event simulation environment

Kádár, B., Pfeiffer, A. & Monostori, L., Dec 1 2005, Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics). p. 595-599 5 p. (Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics); vol. 3690 LNAI).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

6 Citations (Scopus)
2004

Adaptation and learning in distributed production control

Monostori, L., Csáji, B. C. & Kádár, B., Jan 1 2004, In : CIRP Annals - Manufacturing Technology. 53, 1, p. 349-352 4 p.

Research output: Contribution to journalArticle

21 Citations (Scopus)
2003

Digital Enterprises: First results of a national R&D project

Monostori, L., Váncza, J., Markus, A., Kádár, B. & Viharos, Z. J., Dec 26 2003, p. 2335-2340. 6 p.

Research output: Contribution to conferencePaper

1 Citation (Scopus)

Improving multi-agent based scheduling by neurodynamic programming

Csáji, B. C., Kádár, B. & Monostori, L., Jan 1 2003, Holonic and Multi-Agent Systems for Manufacturing - 1st International Conference on Industrial Applications of Holonic and Multi-Agent Systems, HoloMAS 2003, Proceedings. Marík, V., McFarlane, D., Marík, V. & Valckenaers, P. (eds.). Springer Verlag, p. 110-123 14 p. (Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics); vol. 3131).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Improving Multi-agent based scheduling by neurodynamic programming

Csáji, B. C., Kádár, B. & Monostori, L., Jan 1 2003, Holonic and Multi-Agent Systems for Manufacturing - 1st International Conference on Industrial Applications of Holonic and Multi-Agent Systems, HoloMAS 2003, Proceedings. Marík, V., Marík, V., McFarlane, D. & Valckenaers, P. (eds.). Springer Verlag, p. 110-123 14 p. (Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics); vol. 2744).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

12 Citations (Scopus)

Real-life scheduling using constraint programming and simulation

Kovács, A., Váncza, J., Kádár, B., Monostori, L. & Pfeiffer, A., Jan 1 2003, In : IFAC Proceedings Volumes (IFAC-PapersOnline). 36, 3, p. 233-238 6 p.

Research output: Contribution to journalConference article

4 Citations (Scopus)
2001

Approaches to increase the performance of agent-based production systems

Kádár, B. & Monostori, L., Jan 1 2001, Engineering of Intelligent Systems - 14th International Conference on Industrial and Engineering Applications of Artificial Intelligence and Expert Systems, IEA/AIE 2001, Proceedings. Monostori, L., Vancza, J. & Ali, M. (eds.). Springer Verlag, p. 612-621 10 p. (Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics); vol. 2070).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

9 Citations (Scopus)
2000

Hierarchy in distributed shop floor control

Bongaerts, L., Monostori, L., McFarlane, D. & Kádár, B., Oct 2000, In : Computers in Industry. 43, 2, p. 123-137 15 p.

Research output: Contribution to journalArticle

113 Citations (Scopus)
1998

Agent based architectures for mastering changes and disturbances in manufacturing

Monostori, L. & Kádár, B., 1998, Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics). Springer Verlag, Vol. 1416. p. 755-764 10 p. (Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics); vol. 1416).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

2 Citations (Scopus)